skip to main content

ANALISIS PENERAPAN PROGRAM STOP WORK AUTHORITY (SWA) PADA PEKERJAAN ARSITEKTUR DAN MEP (MECHANICAL, ELECTRICAL, DAN PLUMBING) (STUDI PROYEK APARTEMEN X PT. Y KOTA DEPOK)

*Rizal Bahtiar  -  , Indonesia
Baju Widjasena  -  , Indonesia
Ida Wahyuni  -  , Indonesia
Received: 27 Sep 2019; Published: 16 Oct 2019.

Citation Format:
Abstract
PT. Y is a construction service company that has a Stop Work Authority (SWA) policy as a form of prevention against work accidents. Based on preliminary survey findings data, there were four incidents of unsafe actions and unsafe conditions that were not given stop work intervention. This shows that there are problems in implementing the Stop Work Authority (SWA) policy. Therefore it is necessary to find the root of the problem so that further alternative solutions to problems can be found related to the implementation of the Stop Work Authority (SWA) policy. The purpose of this study is to describe and find in- depth information about the application of the Stop Work Authority (SWA) program in Architecture and MEP (Mechanical, Electrical, and Plumbing) work in the X Apartment Project PT. Y Depok City with qualitative methods. In this study the sample was selected using purposive sampling to obtain two main informants and seven triangulation informants. The instruments used in this study were in- depth interview guidelines and observation sheets. From the interviews it was found that the project personnel did not fully know the points of the Stop Work Authority (SWA) policy, there were still project personnel who had low expertise in stopping work interventions, project personnel had good motivation due to the encouragement factor from PT. Y and the same background, supervision is considered not optimal because it only focuses on violations of unsafe actions and unsafe conditions, and the use of SWA forms is only done by HSE staff. PT. Y still needs to optimize communication and oversight of the Stop Work Authority (SWA) policy and ensure that all personnel have the knowledge and expertise regarding the provision of stop work interventions.
Fulltext View|Download
Keywords: the Stop Work Authority (SWA) policy, unsafe actions, unsafe conditions

Article Metrics:

Article Info
Section: Keselamatan dan Kesehatan Kerja
Language : ID
Recent articles
ANALISIS MINAT MAHASISWA UNIVERSITAS DIPONEGORO TERHADAP PEMANFAATAN PELAYANAN KESEHATAN KLINIK PRATAMA UNDIP ANALISIS PENYELENGGARAAN PENGAWASAN PROGRAM PENDAMPINGAN IBU HAMIL DAN IBU NIFAS RISIKO TINGGI OLEH TIM PENGGERAK PKK KECAMATAN PEDURUNGAN (DALAM PERSPEKTIF PERENCANAAN DAN MEKANISME) HUBUNGAN PENDIDIKAN, BUDAYA, TEMAN SEBAYA DENGAN PERNIKAHAN USIA MUDA DI KECAMATAN KANDANGHAUR INDRAMAYU TAHUN 2018 The Association Some Factors With Anxiety Postpartum in Semarang City Rat Density of Leptospirosis Case in Puskesmas Ngemplak Boyolali Regency HUBUNGAN PENGETAHUAN TENTANG PENGENDALIAN VEKTOR DEMAM BERDARAH DENGUE (DBD) DENGAN PRAKTIK PENGGUNAAN INSEKTISIDA RUMAH TANGGA DI KELURAHAN TEMBALANG PERBEDAAAN KETERSEDIAAN PANGAN PANTI, TINGKAT KECUKUPAN ENERGI-PROTEIN DAN STATUS GIZI LANSIA PEREMPUAN ANTARA PANTI WREDHA NEGERI DAN SWASTA (Studi di Unit Rehabilitasi Sosial Pucang Gading Provinsi Jawa Tengah dan Panti Wredha Harapan Ibu Kota Semarang) FAKTOR-FAKTOR YANG BERHUBUNGAN DENGAN KESESUAIAN PRAKTIK GIZI PADA LANSIA BERDASARKAN 10 PESAN GIZI SEIMBANG (Studi di Kelurahan Sambiroto Kota Semarang) ANALISIS PENERAPAN PROGRAM STOP WORK AUTHORITY (SWA) PADA PEKERJAAN ARSITEKTUR DAN MEP (MECHANICAL, ELECTRICAL, DAN PLUMBING) (STUDI PROYEK APARTEMEN X PT. Y KOTA DEPOK) CORRELATON OF EMPLOYEE CHARACTERISTICS, HOUSEKEEPING, AVAILABILITY AND USE OF PERSONAL PROTECTIVE EQUIPMENT TOWARDS MINOR INJURY (Study of Apartment X Construction Project, Semarang City) EVALUASI KINERJA INSTALASI PENGOLAHAN AIR LIMBAH DENGAN SISTEM LUMPUR AKTIF (ACTIVATED SLUDGE) DI RUMAH PEMOTONGAN UNGGAS PENGGARON SEMARANG EVALUASI PELAKSANAAN PILAR PERTAMA STOP BUANG AIR BESAR SEMBARANGAN PADA PROGRAM SANITASI TOTAL BERBASIS MASYARAKAT DI KABUPATEN NAGEKEO HUBUNGAN PERSEPSI KERENTANAN DAN PERSEPSI ANCAMAN DENGAN PERAN PMO DALAM PEMBERIAN OBAT TB PADA ANAK TERHADAP PENCEGAHAN KEJADIAN DROP OUT FAKTOR YANG BERHUBUNGAN DENGAN PRAKTIK IBU DALAM MELINDUNGI KELUARGA DARI PAPARAN ASAP ROKOK More recent articles

Last update:

No citation recorded.

Last update:

No citation recorded.