skip to main content

ANALISIS KEPATUHAN SUPERVISOR TERHADAP IMPLEMENTASI PROGRAM OCCUPATIONAL HEALTH & SAFETY (OHS) PLANNED INSPECTION DI PT. CCAI

*Dewi Sarah  -  , Indonesia
Ekawati Ekawati  -  , Indonesia
Baju Widjasena  -  , Indonesia
Received: 24 Jun 2016; Published: 13 Dec 2017.

Citation Format:
Abstract
The Government has issued Regulation Legislation No. 50 Year 2012 on Health and Safety Management System (SMK3). CCAI is a company that has implemented SMK3. The application of the CCAI SMK3 supported by K3 program one of them is OHS Planned Inspection. This study aimed to analyze the implementation of Occupational Health & Safety (OHS) program Planned Inspection in CCAI. The subjects of this study amounted to five people as the main informants and 2 as an informant triangulation. The results showed key informants already knew this progrtam, goals, objectives, and program execution time. The attitude of key informants agreed with this program and in this  implementation need a good communication to superiors, as well as to the team below. The availability of facilities in the form is a checklist. The main informant had never been trained filling checklist. SOP that there has not been spread widely disseminated to all employees including key informants. Supervision only from an informant triangulation and has not from the respective. The results showed a less training and supervision provided by the OHS (Occupational Health Safety). This resulted in the knowledge and attitudes of employees is still low on the implementation of Planned Inspection program. CCAI need to provide training to fill the key informant checklist to improve the capability and compliance in conducting Planned Inspection program. Improve the surveilance and communication in the implementation of the program.
Fulltext View|Download
Keywords: compliance, Planned Inspection program, Supervisor

Article Metrics:

Article Info
Section: Keselamatan dan Kesehatan Kerja
Recent articles
ANALISIS KUALITAS PELAYANAN REHABILITASI SESUAI STANDAR PELAYANAN BAGI PENYALAH GUNA NAPZA DI RUMAH DAMAI, GUNUNGPATI, SEMARANG PENGARUH KOMUNIKASI, KEPERCAYAAN DAN KOMITMEN BIDAN PRAKTIK MANDIRI TERHADAP KEPUTUSAN KERJASAMA DENGAN BPJS KESEHATAN HUBUNGAN AKTIVITAS FISIK DENGAN GANGGUAN MENSTRUASI WANITA PASANGAN USIA SUBUR DI DESA TEMANGGUNG KECAMATAN KALIANGKRIK KABUPATEN MAGELANG TAHUN 2015 HUBUNGAN PENGETAHUAN DAN SIKAP WANITA PUS DENGAN KEJADIAN PERNIKAHAN DINI DI DESA LANJAN KECAMATAN SUMOWONO KABUPATEN SEMARANG TAHUN 2013 FAKTOR – FAKTOR INTERNAL KETIDAKPATUHAN PENGOBATAN HIPERTENSI DI PUSKESMAS KEDUNGMUNDU KOTA SEMARANG FAKTOR-FAKTOR YANG BERHUBUNGAN DENGAN STATUS KESEMBUHAN PENDERITA TUBERKULOSIS PARU GAMBARAN PEMANFAATAN BILIK LAKTASI DI SARANA UMUM KOTA SEMARANG TAHUN 2015 Hubungan Asupan Energi, Asupan Protein, dan Kadar Hemoglobin dengan Produktivitas Kerja Wanita Petani Kelurahan Tegalroso, Kabupaten Temanggung Tahun 2015 HUBUNGAN KEPUASAN KERJA DENGAN KELUHAN NYERI PUNGGUNG BAWAH PADA KARYAWAN PERUM BULOG KANTOR SUB DIVRE VI WILAYAH PEKALONGAN HUBUNGAN INTAKE MAKANAN (KALORI) DENGAN KELELAHAN KERJA PADA PERAWAT SHIFT PAGI UGD PAVILIUN RS. X JAKARTA HUBUNGAN FAKTOR LINGKUNGAN DENGAN PERSEBARAN KEJADIAN DEMAM BERDARAH DENGUE (DBD) DI KECAMATAN JEPARA KABUPATEN JEPARA PERBEDAAN KADAR TIMBAL (Pb) DALAM DARAH BERDASARKAN JENIS PEKERJAAN PADA PEKERJA INDUSTRI PENGECORAN LOGAM DI CV. BONJOR JAYA, CEPER, KLATEN Analisis Pelaksanaan Promosi Kesehatan Bagi Karyawan Berisiko Tinggi Penyakit Degeneratif Oleh Health Care Center PT Holcim Indonesia Tbk Cilacap Plant Faktor-Faktor Yang Berhubungan Dengan Perilaku Kerja Karyawan Penderita Aging Disease Di PT Holcim Indonesia Tbk Cilacap Plant More recent articles

Last update:

No citation recorded.

Last update:

No citation recorded.