slot gacor slot gacor hari ini slot gacor 2025 demo slot pg slot gacor slot gacor
OPTIMISASI PERFORMA GAS TURBINE GENERATOR (GTG) UNIT PLTGU CILEGON PGU MELALUI ANALISIS PERFORMA PADA VARIABEL BEBAN BERBEDA DAN STRATEGI PENINGKATAN EFISIENSI PT. PLN INDONESIA POWER CILEGON PGU | Antariksa | JURNAL TEKNIK MESIN skip to main content

OPTIMISASI PERFORMA GAS TURBINE GENERATOR (GTG) UNIT PLTGU CILEGON PGU MELALUI ANALISIS PERFORMA PADA VARIABEL BEBAN BERBEDA DAN STRATEGI PENINGKATAN EFISIENSI PT. PLN INDONESIA POWER CILEGON PGU

*Aulia Alva Antariksa  -  Department of Mechanical Engineering, Universitas Diponegoro, Jl. Prof. Sudarto, SH, Tembalang, Semarang, Indonesia 50275, Indonesia
Nazaruddin Sinaga  -  Department of Mechanical Engineering, Universitas Diponegoro, Jl. Prof. Sudarto, SH, Tembalang, Semarang, Indonesia 50275, Indonesia

Citation Format:
Abstract
Pada era moderenisasi ini, tidak dapat dipungkiri kebutuhan listrik akan terus bertambah seiring berkembangnya zaman. Maka dari itu suatu pembangkit listrik bekerja tanpa henti. Efisiensi performa gas turbin sangat penting dalam industri pembangkit listrik karena berhubungan langsung dengan biaya produksi energi listrik. Diperlukan analisis peforma gas turbine generator pada variasi beban berbeda unit PLTGU Cilegon PGU dalam upaya untuk meningkatkan efisiensi nya. dengan membandingkan performa turbin dengan beban 120 MW, 135 MW, 150 MW, 175 MW, dan 198 MW. Performa turbin yang akan dihitung antara lain adalah daya kompresor, daya turbin, konsumsi bahan bakar spesifik, efisiensi kompresor, efisiensi turbin dan efisiensi thermal. Efisiensi thermal tertinggi diperoleh saat beban 135 MW, sedangkan efisiensi terendah diperoleh saat beban 198 MW, sedangkan nilai SFC turun dengan bertambahnya beban. SFC tertinggi diperoleh saat beban 120 MW sedangkan efisiensi terendah diperoleh saat beban 198 MW. Penurunan suhu masuk kompresor pada gas turbine generator dapat meningkatkan efisiensi termal, rasio kerja optimal, dan menangani tantangan lingkungan.
Fulltext View|Download
Keywords: efisiensi; gas turbin generator; optimalisasi
  1. Das, S. (2013). A Cooling Unit to Increase the Efficiency of Gas Turbine Plant. 4(July), 1–5
  2. I Gusti Ketut Sukadana. (2015). TEORI TURBIN GAS DAN JET PROPULSI. PS. Teknik Mesin Universitas Udayana
  3. Li, Y., Lin, Y., He, Y., Zhang, G., Zhang, L., Yang, J., & Sun, E. (2023). Part-load performance analysis of a dual-recuperated gas turbine combined cycle system. Energy, 269(January), 126744. https://doi.org/10.1016/j.energy.2023.126744
  4. .Naryono, I. (2013). ANALISIS EFISIENSI TURBIN GAS TERHADAP BEBAN OPERASI PLTGU MUARA TAWAR BLOK 1. 7(2), 78–94
  5. Sharma, A. K., Singhania, A., Kumar, A., Mandal, B. K., & Roy, R. (2017). Improvement of Gas Turbine Power Plant Performance : 3, 658–663
  6. Wibowo, B. A. (2022). Analisis kinerja turbin gas ( GT 3 . 1 ) PLTGU Muarakarang setelah masa konstruksi sesuai ISO 2314 : 2009. 1(1), 8–19
  7. liyu, M., AlQudaihi, A. B., Said, S. A. M., & Habib, M. A. (2020). Energy, exergy and parametric analysis of a combined cycle power plant. Thermal Science and Engineering Progress, 15, 100450. https://doi.org/10.1016/J.TSEP.2019.100450
  8. Almajali, M. R., & Quran, O. A. S. (2021). Parametric Study on the Performance of Combined Power Plant of Steam and Gas Turbines. March. https://doi.org/10.1115/1.4049753
  9. Yunus, A. C., & Michael, A. B. (2002). Thermodynamics : An Engineering Approach. 4th ed. McGraw-Hill
  10. Moran, M. J., & Howard, N. S. (2006). Fundamentals of Engineering Thermodynamics 5th Edition (5th Editio)
  11. Boyce, M. P. (2006). Gas Turbine Engineering Handbook Third Edition