skip to main content

ANALISIS KEPATUHAN SUPERVISOR TERHADAP IMPLEMENTASI PROGRAM OCCUPATIONAL HEALTH & SAFETY (OHS) PLANNED INSPECTION DI PT. CCAI

*Dewi Sarah  -  , Indonesia
Ekawati Ekawati  -  , Indonesia
Baju Widjasena  -  , Indonesia
Received: 24 Jun 2016; Published: 13 Dec 2017.

Citation Format:
Abstract
The Government has issued Regulation Legislation No. 50 Year 2012 on Health and Safety Management System (SMK3). CCAI is a company that has implemented SMK3. The application of the CCAI SMK3 supported by K3 program one of them is OHS Planned Inspection. This study aimed to analyze the implementation of Occupational Health & Safety (OHS) program Planned Inspection in CCAI. The subjects of this study amounted to five people as the main informants and 2 as an informant triangulation. The results showed key informants already knew this progrtam, goals, objectives, and program execution time. The attitude of key informants agreed with this program and in this  implementation need a good communication to superiors, as well as to the team below. The availability of facilities in the form is a checklist. The main informant had never been trained filling checklist. SOP that there has not been spread widely disseminated to all employees including key informants. Supervision only from an informant triangulation and has not from the respective. The results showed a less training and supervision provided by the OHS (Occupational Health Safety). This resulted in the knowledge and attitudes of employees is still low on the implementation of Planned Inspection program. CCAI need to provide training to fill the key informant checklist to improve the capability and compliance in conducting Planned Inspection program. Improve the surveilance and communication in the implementation of the program.
Fulltext View|Download
Keywords: compliance, Planned Inspection program, Supervisor

Article Metrics:

Article Info
Section: Keselamatan dan Kesehatan Kerja
Recent articles
Analisis Hubungan Gaya Kepemimpinan dan Motivasi dengan Kinerja Pegawai RumahSakit Bhayangkara Tk. I Raden Said Sukanto Jakarta ANALISIS FAKTOR INTERNAL DAN EKSTERNAL SEBAGAI BAHAN PENYUSUN STRATEGI PENCEGAHAN FRAUD DANA KAPITASI PUSKESMAS DI KOTA SEMARANG PENGARUH MOTIVASI DAN PERSEPSI PELAYANAN TERHADAP KETERATURAN ANTENATAL CARE PADA IBU HAMIL DI PUSKESMAS NGEMPLAK SIMONGAN KOTA SEMARANG PADA TRI WULAN I TAHUN 2015 HUBUNGAN AKTIVITAS FISIK DENGAN GANGGUAN MENSTRUASI WANITA PASANGAN USIA SUBUR DI DESA TEMANGGUNG KECAMATAN KALIANGKRIK KABUPATEN MAGELANG TAHUN 2015 PENGARUH VARIASI WARNA KUNING PADA FLY GRILL TERHADAP KEPADATAN LALAT (STUDI DI TEMPAT PELELANGAN IKAN TAMBAK LOROK KOTA SEMARANG) Effect Of Variation The Color Yellow On Fly Grill To Density Of Flies (Study At Fish Ouction Place Tambak Lorok Semarang Cit SURVEI KEBERADAAN FORMALIN PADA PRODUK PERIKANAN LAUT SEGAR YANG DIJUAL DI PASAR TRADISIONAL KOTA SEMARANG Survey of Formaldehyde Existence In Fresh Sea Fisheries Product Sold At Traditional Market Of Semarang City FAKTOR-FAKTOR YANG BERHUBUNGAN DENGAN KEBIASAAN DAN KUALITAS SARAPAN SISWA KELAS V DI SDN SENDANGMULYO 04 KECAMATAN TEMBALANG, SEMARANG TAHUN 2015 HUBUNGAN PENGETAHUAN DAN SIKAP IBU NIFAS DENGAN PRAKTIK PERAWATAN MASA NIFAS DI KECAMATAN GUNUNGPATI KOTA SEMARANG BULAN JANUARI-MARET 2015 HUBUNGAN GERAKAN REPETITIF DAN LAMA KERJA DENGAN KELUHAN CARPAL TUNNEL SYNDROME PADA MAHASISWA TEKNIK ARSITEKTUR HUBUNGAN STATUS AKLIMATISASI DAN EFEK HEAT STRESS PADA PEDAGANG KAKI LIMA DI DEPAN POLINES (POLITEKNIK NEGERI SEMARANG) JL. PROF. H. SOEDARTO, SH, TEMBALANG, SEMARANG HUBUNGAN KONDISI LINGKUNGAN FISIK RUMAH DAN PERILAKU ANGGOTA KELUARGA DENGAN KEJADIAN PNEUMONIA PADA BALITA (Studi Kasus di Wilayah Kerja Puskesmas Magelang Selatan Kota Magelang) HUBUNGAN ANTARA MASA KERJA DENGAN KADAR TIMBAL (Pb) DALAM DARAH PADA PEKERJA INDUSTRI PENGECORAN LOGAM CV. BONJOR JAYA DI DESA BATUR, CEPER, KLATEN Analisis Faktor-Faktor Penyebab Perilaku Merokok Remaja di SMK “X” Surakarta Faktor-Faktor Yang Berhubungan Dengan Perilaku Kerja Karyawan Penderita Aging Disease Di PT Holcim Indonesia Tbk Cilacap Plant More recent articles

Last update:

No citation recorded.

Last update:

No citation recorded.