ANALISIS POTENSI BAHAYA DENGAN METODE HAZARD IDENTIFICATION RISK ASSESMENT AND DETERMINING CONTROL (HIRADC) PADA PROYEK INSTALASI SOLAR PANEL

*Carrisa Angelia Bangun  -  Departemen Teknik Industri, Fakultas Teknik, Universitas Diponegoro, , Indonesia
Heru Prastawa  -  Departemen Teknik Industri, Fakultas Teknik, Universitas Diponegoro, , Indonesia

Citation Format:
Abstract

Abstrak

Penelitian ini mengkaji potensi bahaya dalam proyek instalasi panel surya dengan menggunakan metode Hazard Identification Risk Assessment and Determining Control (HIRADC). Metode ini bertujuan untuk mengidentifikasi, menilai, dan mengendalikan risiko yang mungkin muncul selama proses instalasi solar panel. Proyek instalasi panel surya umumnya dilakukan di ketinggian dan berdekatan dengan aliran listrik sehingga berpotensi menimbulkan berbagai risiko tinggi seperti jatuh dan tersetrum.. Data dikumpulkan melalui observasi langsung dan wawancara dengan pekerja, kemudian dianalisis menggunakan skala kemungkinan (likelihood) dan tingkat keparahan (severity) untuk menentukan tingkat risiko. Hasil penelitian menunjukkan bahwa risiko utama dalam proyek ini meliputi cedera fisik akibat jatuh dari ketinggian, tersetrum selama proses interkoneksi, dan gangguan kesehatan akibat postur kerja yang buruk dan paparan bahan berbahaya. Rekomendasi untuk mengendalikan risiko diberikan berdasarkan hierarki pengendalian risiko untuk memastikan keselamatan dan kesehatan kerja yang optimal di lokasi proyek instalasi panel surya.

Kata kunci: HIRADC; instalasi solar panel; keselamatan kerja; identifikasi bahaya; penilaian risiko, pengendalian risiko

Abstract

This research examines potential hazards in solar panel installation projects using the Hazard Identification Risk Assessment and Determining Control (HIRADC) method. This method aims to identify, assess, and control risks that may arise during the solar panel installation process. Solar panel installation projects are generally carried out at heights and in close proximity to electricity, potentially posing various high risks such as falls and electric shocks. Data were collected through direct observation and interviews with workers, then analysed using likelihood and severity scales to determine the level of risk. The results showed that the main risks in this project include physical injury due to falling from height, electric shock during the interconnection process, and health problems due to poor work posture and exposure to hazardous materials. Recommendations to control the risks are given based on the risk control hierarchy to ensure optimal occupational safety and health at the solar panel installation project site.

Keywords: HIRADC; solar panel installation; occupational health; occupational safety; hazard identification; risk assessment, risk control.