BibTex Citation Data :
@article{PILARS41132, author = {Galang Nugraha and Onyvia Elfrida and Asri Nurdiana and Riza Susanti}, title = {Perencanaan Ulang Overpass Cabe Raya, Ciputat, Tangerang Selatan Berbasis BIM}, journal = {Jurnal Sipil dan Arsitektur}, volume = {3}, number = {1}, year = {2025}, keywords = {}, abstract = { BIM (Building Information Modeling) includes various important information in design. Modeling with BIM technology used in infrastructure planning is a form of technological development that presents digital physical and functional planning objects. The Cabe Raya overpass was built with the aim of reducing the congestion that occurs on the Pondok Cabe Raya road, South Tangerang. This planning aims to re-plan the construction of the Cabe Raya overpass based on BIM by modeling 4D using the Tekla Structures application. This re-planning will carry out analysis of data obtained from the project site review. The loading method refers to the Bridge and Highway Loading Standards (SNI 1725 2016). This planning goes through the main stages, namely, analysis of loading data then planning manual structural calculations, planning the cost budget design using Ms. Projects. It is planned that from the results of the preparation of the budget plan that will be needed is Rp. 8,930,872,000.00 and is planned to be completed in approximately 8 months. }, issn = {2988-5973}, pages = {67--76} doi = {10.14710/pilars.3.1.2025.67-76}, url = {https://ejournal3.undip.ac.id/index.php/pilars/article/view/41132} }
Refworks Citation Data :
BIM (Building Information Modeling) includes various important information in design. Modeling with BIM technology used in infrastructure planning is a form of technological development that presents digital physical and functional planning objects. The Cabe Raya overpass was built with the aim of reducing the congestion that occurs on the Pondok Cabe Raya road, South Tangerang. This planning aims to re-plan the construction of the Cabe Raya overpass based on BIM by modeling 4D using the Tekla Structures application. This re-planning will carry out analysis of data obtained from the project site review. The loading method refers to the Bridge and Highway Loading Standards (SNI 1725 2016). This planning goes through the main stages, namely, analysis of loading data then planning manual structural calculations, planning the cost budget design using Ms. Projects. It is planned that from the results of the preparation of the budget plan that will be needed is Rp. 8,930,872,000.00 and is planned to be completed in approximately 8 months.
Article Metrics:
Last update:
The copyright notice in the Journal of Civil and Architecture (Jurnal Sipil dan Arsitektur) confirms that all published articles, illustrations, and related content are protected by copyright. Each work displayed, be it the result of research, architectural design, or case studies in the civil and architectural fields, has a copyright owned by the author or related institution, which is marked with a symbol ©, year of publication, and the name of the copyright owner. The inclusion of this copyright notice aims to maintain the integrity of scientific works, prevent unauthorized use, and encourage respect for intellectual property rights in the academic and professional communities. We encourage readers to appreciate and cite these works appropriately.
Departemen Sipil dan Perencanaan, Sekolah Vokasi, Universitas Diponegoro. Jl. Gubernur Mochtar, Tembalang, Kecamatan Tembalang, Kota Semarang, Jawa Tengah 50275. email : pilar@live.undip.ac.id
Jurnal Sipil dan Arsitektur is indexed in: