Re-Design Struktur Gedung Head Office Awann Group Berdasarkan Integrasi BIM Autodesk melalui Revit, Naviswork, dan SAP2000

*Adam Rizky Christiandava orcid  -  Department of civil Infrastructure Engineering And Architectural Design, Universitas Diponegoro, Jl. Prof. Sudarto, SH, Tembalang, Semarang, Indonesia 50275, Indonesia
Adelia Azzahra orcid  -  Department of civil Infrastructure Engineering And Architectural Design, Universitas Diponegoro, Jl. Prof. Sudarto, SH, Tembalang, Semarang, Indonesia 50275, Indonesia
Asri Nurdiana  -  Department of civil Infrastructure Engineering And Architectural Design, Universitas Diponegoro, Jl. Prof. Sudarto, SH, Tembalang, Semarang, Indonesia 50275, Indonesia
Bambang Setiabudi  -  Department of civil Infrastructure Engineering And Architectural Design, Universitas Diponegoro, Jl. Prof. Sudarto, SH, Tembalang, Semarang, Indonesia 50275, Indonesia

Citation Format:
Abstract
Building Information Modeling (BIM), implementation is an innovative advancement in the construction industry. Generally, developing a construction project requires several phases in which information is created manually using a lot of software. Unfortunately, the steps that must be completed in conventional software for project management are inefficient and susceptible to misinterpretation, which frequently causes issues. Therefore, this study focuses on re-planning the Awann Group Semarang Head Office Building using BIM integration based on Autodesk Revit, Naviswork, and SAP 2000 planning software. Re-planning is conducted under SNI 2847-2019 for structural concrete planning requirements, SNI 1727-2020 for minimum load review, and SNI 1726-2019 for structural earthquake resistance standards. This plan produces structural analysis for calculating the feasibility of a building structure, 3D designs from Revit software that can generate 2D designs for Detail Engineering Designs, and work volumes for RAB calculations. Then, for scheduling, Revit will be integrated with Naviswork, which can display scheduling with 3D visualization. The re-planning of the Head office of the Awan Group Semarang resulted in a budget plan of Rp. 4,661,246,792.98 was calculated using the automatic Quantity Take Off from Autodesk Revit and scheduling planning using Microsoft Project and Autodesk Naviswork for ten months of work.
Fulltext View|Download

Article Metrics:

  1. Ernest Kissi, Emmanuel Bannor Boateng and Theophilus Adjei-Kumi (2015) ‘Strategies for implementing value management in the construction industry of Ghana’, 2nd International Conference on Development and Investment in Infrastructure (DII) Conference. Available at: http://diiconference.org/
  2. McGraw Hill Construction (2015) The Business Value of BIM in China, SmartMarket Report
  3. Mousa, A. (2015) ‘A Business approach for transformation to sustainable construction: An implementation on a developing country’, Resources, Conservation and Recycling, 101, pp. 9–19. doi: 10.1016/j.resconrec.2015.05.007
  4. Olanrewaju, O., Ajiboye Babarinde, S. and Salihu, C. (2020) ‘Current State of Building Information Modelling in the Nigerian Construction Industry’, Journal of Sustainable Architecture and Civil Engineering, 27(2), pp. 63–77. doi: 10.5755/j01.sace.27.2.25142
  5. Olanrewaju, O. I. et al. (2022) ‘Modelling the relationship between Building Information Modelling (BIM) implementation barriers, usage and awareness on building project lifecycle’, Building and Environment, 207(PB), p. 108556. doi: 10.1016/j.buildenv.2021.108556
  6. Oraee, M. et al. (2019) ‘Collaboration barriers in BIM-based construction networks: A conceptual model’, International Journal of Project Management, 37(6), pp. 839–854. doi: 10.1016/j.ijproman.2019.05.004
  7. Othman, I. et al. (2021) ‘The level of Building Information Modelling (BIM) Implementation in Malaysia’, Ain Shams Engineering Journal, 12(1), pp. 455–463. doi: 10.1016/j.asej.2020.04.007
  8. Phang, T. C. H., Chen, C. and Tiong, R. L. K. (2019) ‘New Model for Identifying Critical Success Factors Influencing BIM Adoption New Model for Identifying Critical Success Factors Influencing BIM Adoption from Precast Concrete Manufacturers ’ View’, (July). doi: 10.1061/(ASCE)CO.1943-7862.0001773

Last update:

No citation recorded.

Last update:

No citation recorded.