skip to main content

HUBUNGAN JOB DEMAND, JOB CONTROL, DAN USIA DENGAN STRES KERJA PADA PEKERJA KONSTRUKSI

*Elizabeth Zavanya Manullang  -  Diponegoro University, Indonesia
Ekawati Ekawati  -  , Indonesia
Siswi Jayanti  -  , Indonesia
Received: 29 Jul 2019; Published: 14 Aug 2019.

Citation Format:
Abstract

Someone with job demands and workload that exceeds his/her capabilities can experience that called job stress. Job stress was really common among construction workers because of the demands of high jobs, limited time and jobs control of low workers. The influence of work stress is complex and mutually influenced by workers demand and control. According to a survey that is obtained from 5 workers, they experience insomnia, uneasiness, and irritable. This research aimed analyze how job demand, job control, and age affect the job stress of the construction workers of the ongoing projects of Gedung Dinas Kesehatan Kota and Gedung Parkir Pandanaran Semarang. The type of research that used is quantitative, with cross-sectional study. The sample is the entire population of 54 workers in the finishing section. The research instruments were General Health Questionnaire (GHQ-12) to measure work stress and questionnaires to measure job demand and job control in workers. Statistic analysis that used is rank spearmen test.The result shows that two variables were related to job stress which are job demand (p-value= 0.001), job control (p-value= 0.038), while variable that was unrelated to job stress is age (p-value= 0.947). Based on the results of the study it was recommended that the company focus on the rule of overtime hours that the workers are facing.

Fulltext View|Download
Keywords: job stress, job demand, job control, construction workers

Article Metrics:

Article Info
Section: Keselamatan dan Kesehatan Kerja
Language : ID
Recent articles
ANALISIS PENYELENGGARAAN PENGAWASAN PROGRAM PENDAMPINGAN IBU HAMIL DAN IBU NIFAS RISIKO TINGGI OLEH TIM PENGGERAK PKK KECAMATAN PEDURUNGAN (DALAM PERSPEKTIF PERENCANAAN DAN MEKANISME) Organizational Factors in the Performance Analysis of Healthy Indonesian Program Data Collection Employee with Family Approaches in Public Health Center HUBUNGAN PENDIDIKAN, BUDAYA, TEMAN SEBAYA DENGAN PERNIKAHAN USIA MUDA DI KECAMATAN KANDANGHAUR INDRAMAYU TAHUN 2018 Beberapa Faktor yang Berhubungan dengan Penggunaan Sistem Informasi oleh Penyuluh KB terhadap Kelengkapan Laporan Kampung KB di Kota Semarang HUBUNGAN ANTARA KEBERSIHAN DIRI DAN PRAKTIK HIGIENE PENJUAL DENGAN KEBERADAAN Escherichia coli PADA NASI RAMES DI PASAR TRADISIONAL KOTA SEMARANG SURVEI KANDUNGAN RESIDU OKSITETRASIKLIN PADA HATI AYAM YANG DIJUAL DI PASAR TRADISIONAL KECAMATAN BANYUMANIK KOTA SEMARANG FAKTOR-FAKTOR YANG BERHUBUNGAN DENGAN KESESUAIAN PRAKTIK GIZI PADA LANSIA BERDASARKAN 10 PESAN GIZI SEIMBANG (Studi di Kelurahan Sambiroto Kota Semarang) PENGARUH PENDIDIKAN GIZI DENGAN MEDIA SAMPUL BUKU TERHADAP PENGETAHUAN DAN SIKAP TENTANG ANEMIA REMAJA PUTRI (studi pada siswi kelas VII di SMP Teuku Umar Semarang) ANALISIS FAKTOR MANUSIA DAN LINGKUNGAN TERHADAP KECELAKAAN LALU LINTAS (Studi pada Pengemudi Travel PO.X di Ruas Jalan Curup – Lubuk Linggau, Kabupaten Rejang Lebong, Bengkulu) CORRELATON OF EMPLOYEE CHARACTERISTICS, HOUSEKEEPING, AVAILABILITY AND USE OF PERSONAL PROTECTIVE EQUIPMENT TOWARDS MINOR INJURY (Study of Apartment X Construction Project, Semarang City) Analisis Sebaran Kasus TB Paru BTA Positif di Kota Semarang Tahun 2018 berdasarkan Suhu Udara EVALUASI KINERJA INSTALASI PENGOLAHAN AIR LIMBAH DENGAN SISTEM LUMPUR AKTIF (ACTIVATED SLUDGE) DI RUMAH PEMOTONGAN UNGGAS PENGGARON SEMARANG Pemahahaman Isi Majalah Promosi Kesehatan Rumah Sakit I Care SMC RS Tlogorejo dengan pengetahuan kesehatan bagi pengunjung rumah sakit STRATEGI COPING STRESS KEJADIAN BULLYING (PERUNDUNGAN) SISWA SMP DI WILAYAH KECAMATAN BANYUMANIK More recent articles

Last update:

No citation recorded.

Last update:

No citation recorded.