skip to main content

PENENTUAN JUMLAH TENAGA KERJA YANG OPTIMAL MELALUI PENGUKURAN BEBAN PRODUKSI APAR MENGGUNAKAN METODE WORKLOAD ANALYSIS PADA PT BROMINDO MEKAR MITRA

*Abni Sukaji Yusuf  -  Departemen Teknik Industri, Fakultas Teknik, Universitas Diponegoro, Jl. Prof. Soedarto, SH, Kampus Undip Tembalang, Semarang, Indonesia 50275
Singgih Saptadi  -  Departemen Teknik Industri, Fakultas Teknik, Universitas Diponegoro, Jl. Prof. Soedarto, SH, Kampus Undip Tembalang, Semarang, Indonesia 50275, Indonesia

Citation Format:
Abstract

Abstrak
PT Bromindo Mekar Mitra merupakan perusahaan terpercaya yang bergerak di bidang distribusi perlengkapan
kebakaran serta jasa perencana, kontraktor, dan perawatan sistem kebakaran yang meliputi fire hydrant, fire alarm,
dan fire suppression systems. Aspek yang perlu diperhatikan agar PT Bromindo Mekar Mitra mampu mengikuti
kondisi produksi yang baik adalah dengan perencanaan jumlah tenaga kerja yang baik. Pekerjaan yang ada pada PT
Bromindo Mekar Mitra, khususnya pada bagian pergudangan dan produksi APAR, banyak pekerjaan dilakukan
secara lembur dikarenakan permintaan yang fluktuatif dan tidak menentu, namun dengan jumlah tenag kerja yang
tetap, kurang dapat memaksimalkan kinerja pekerja. Hal tersebut menunjukan adanya pekerja yang memiliki kinerja
dan akurasi yang kurang baik yang disebabkan dari beban kerja yang kurang sesuai dengan kemampuan pekerja.
Sehingga untuk mengatasi hal tersebut, dilakukan perbaikan perbaikan dan pengoptimalan jumlah tenaga kerja.
Pengoptimalan tersebut dilakukan menggunakan metode workload analysis (WLA) yang merupakan gambaran dari
beban kerja yang dibutuhkan dalam perusahaan dengan mempertimbangkan target produksi, jumlah tenaga kerja,
serta waktu yang diperlukan dalam setiap langkah produksi. Hasil penelitian menunjukkan bahwa adanya
pengoptimalan jumlah tenaga kerja yang disesuaikan dengan beban kerja pada pembuatan APAR. Dari 8 langkah
kerja, WLA terbesar didapat pada Langkah kerja 1 dengan nilai WLA sebesar 1,3698. Sehingga dengan nilai WLA
tersebut, rekomendasi jumlah tenaga kerja pada Langkah kerja 1 dari 1 orang menjadi 2 orang. Dengan hal tersebut,
akan menyeimbangkan beban kerja, mengoptimalkan waktu produksi, dan meningkatkan produktifitas pekerja.
Kata Kunci : beban kerja; jumlah tenaga kerja; stopwatch time study; workload analysis; produktifitas kerja
Abstract
PT Bromindo Mekar Mitra is a trusted company engaged in the distribution of fire equipment as well as fire system
planning, contractor and maintenance services which include fire hydrants, fire alarms and fire suppression systems.
The aspect that needs to be considered so that PT Bromindo Mekar Mitra is able to follow good production conditions
is planning a good number of workers. Existing work at PT Bromindo Mekar Mitra, especially in the warehousing
and APAR production section, a lot of work is done overtime due to fluctuating and uncertain demand, but with a
fixed number of workers, it is not able to maximize worker performance. This shows that there are workers who have
poor performance and accuracy caused by workloads that are not in accordance with the abilities of workers. So as
to overcome this, improvements are made and optimization of the number of workers. The optimization is carried out
using the workload analysis (WLA) method, which is an illustration of the workload required by the company by
considering production targets, the number of workers, and the time required in each production step. The results of
the study indicate that there is an optimization of the number of workers according to the workload in making fire
extinguishers. Of the 8 work steps, the largest WLA is obtained in work step 1 with a WLA value of 1.3698. So that
with the WLA value, the recommended number of workers in work step 1 is from 1 person to 2 people. With this, it
will balance the workload, optimize production time, and increase worker productivity.
Keyword : workload; total manpower; stopwatch time study; workload analysis; work productivity

Fulltext View|Download
Keywords: workload; total manpower; stopwatch time study; workload analysis; work productivity

Last update:

No citation recorded.

Last update:

No citation recorded.