skip to main content

Perancanaan Jembatan Beton Prategang RSUD Temanggung dengan Berbasis Building Information Modeling (BIM) 3D, 4D, dan 5D

*Dianya Puan Anandita  -  Teknik Infrastruktur Sipil dan Perancangan Arsitektur, Sekolah Vokasi, Universitas Diponegoro, Indonesia, Indonesia
Asri Nurdiana Nurdiana  -  Teknik Infrastruktur Sipil dan Perancangan Arsitektur, Sekolah Vokasi, Universitas Diponegoro, Indonesia, Indonesia
Bambang Setiabudi  -  Teknik Infrastruktur Sipil dan Perancangan Arsitektur, Sekolah Vokasi, Universitas Diponegoro, Indonesia, Indonesia

Citation Format:
Abstract
Building Information Modeling (BIM) technological innovations can assist in designing construction designs to be integrated with each other, so that the process can be more effective and efficient. This Building Information Modeling (BIM) technology can be applied to various construction works, including road and bridge construction work. In this study the authors will plan the construction work of a prestressed concrete bridge at Temanggung Hospital which includes bridge geometric planning, structural loading and reinforcement calculations, 3D modeling and calculation of concrete volume and reinforcement using Autodesk Revit, as well as designing a cost budget and time schedule using Microsoft Project. From the analysis. Based on the results of the analysis, obtained a 17,453-meter-long Full Circle bend plan with a 4% incline, the elevation of the bridge is 14,470 meters from the riverbed, the design of the bridge at the Temanggung Hospital is safe against work loads, the total cost needed in the construction of the Temanggung Hospital Bridge is Rp. 7,875,323,851, with a duration of work of 5 months starting from 1 August 2023 to 9 December 2023.
Fulltext View|Download

Article Metrics:

  1. Autodesk Revit. (n.d.). What is Revit? Retrieved April 27, 2023, from https://www.autodesk.com/products/revit/overview?term=1-YEAR&tab=subscription&plc=RVT
  2. Huzaini, S. (2021). TUGAS AKHIR PENERAPAN KONSEP BUILDING INFORMATION MODELLING ( BIM ) 3D DALAM MENDUKUNG PENGESTIMASIAN BIAYA PEKERJAAN STRUKTUR APPLICATION THE CONCEP OF BUILDING INFORMATION MODELLING ( BIM ) 3D IN SUPPORTING STRUCTURAL WORK COST Syahrul Huzaini PENERAPAN. Universitas Islam Indonesia
  3. Kelvin, R. (2022). PERENCANAAN DAN PERANCANGAN (3D,4D,5D) JEMBATAN RANGKA BAJA DENGAN PENERAPAN KONSEP BUILDING INFORMATION MODELING (BIM) [Universitas Andalas]. http://scholar.unand.ac.id/108905/
  4. Mahapatni, I. A. P. S. (2019). Metode Perencanaan dan Pengendalian Proyek Konstruksi. In UNHI Press. UNHI Press
  5. Negara, K. P., Unas, S. El, Hasyim, M. H., & Aditha, M. (2015). Perhitungan Harga Satuan Pekerjaan Dinding Bata Ringan Dengan Metode Sni & Ms. Project Pada Proyek Pembangunan Gedung Laboratorium Enterpreneurship Terpadu Universitas Brawijaya Malang. Jurnal Rekayasa Sipil, 9(2), 159–167
  6. Suprayitno, B. (2012). Privatisasi Jalan Tol Sebagai Solusi Dalam Mempercepat Terwujudnya. Jurnal Economia, 8(1), 65–77

Last update:

No citation recorded.

Last update:

No citation recorded.