slot gacor slot gacor hari ini slot gacor 2025 demo slot pg slot gacor slot gacor
PERENCANAAN ULANG STRUKTUR GEDUNG PRASETIYA MULYA BUSINESS SCHOOL | Winanti | Jurnal Karya Teknik Sipil skip to main content

PERENCANAAN ULANG STRUKTUR GEDUNG PRASETIYA MULYA BUSINESS SCHOOL

*Jihan Zahara Winanti  -  Jurusan Teknik Sipil FT. UNDIP, Indonesia
Hanik Kurniyati R.  -  Jurusan Teknik Sipil FT. UNDIP, Indonesia
Windu Partono  -  Jurusan Teknik Sipil FT. UNDIP, Indonesia
Hardi Wibowo  -  Jurusan Teknik Sipil FT. UNDIP, Indonesia

Citation Format:
Abstract
Design of the building structure was done in order to standing and strong receiving a load on it. Each one of the building structure with another building structure certainly have differences,  the differences include the strength of materials, use of materials, dimensions of the cross section, the calculation of the structure, work stage and so on. This difference is causes the strength of each structure is different, and also differences in cost of structure.Therefore, we would like to know differences of  strength and costs resulting from redesign of the Prasetiya Business School building by eliminating shearwall and open-frame method. Redesign on this structure using the method System Bearer Special Moment.
Fulltext View|Download
Keywords: redesign; shear wall; open frame

Last update:

No citation recorded.

Last update:

No citation recorded.