slot gacor slot gacor hari ini slot gacor 2025 demo slot pg slot gacor slot gacor
PERENCANAAN PEMBANGKIT LISTRIK TENAGA MINI HIDRO (PLTM) PALUMBUNGAN, PURBALINGGA | Prasetiyanto | Jurnal Karya Teknik Sipil skip to main content

PERENCANAAN PEMBANGKIT LISTRIK TENAGA MINI HIDRO (PLTM) PALUMBUNGAN, PURBALINGGA

*Andi Prasetiyanto  -  Jurusan Teknik Sipil FT. UNDIP, Indonesia
Nizar Mahrus  -  Jurusan Teknik Sipil FT. UNDIP, Indonesia
Sri Sangkawati  -  Jurusan Teknik Sipil FT. UNDIP, Indonesia
Robert J. Kodoatie  -  Jurusan Teknik Sipil FT. UNDIP, Indonesia

Citation Format:
Abstract

Conditions Purbalingga areas potential for the development of Mini Hydro Power Plant, is the fundamental reason for empowering Klawing River District Bobotsari Purbalingga became a source of Mini Hydro Power Plant. The objective of mini hydro power plant planning is to  calculation of dependable flow, the calculation of the electricity which can be produced and made design of hydropower building. The method that apply for flood discharge plan calculation is Rational Method, Dependable flow analyzed by using Weibull Method. Dependable flow for mini hydro power plants amounted to 1.8 m3/s  and the power produced is 641 kW.

Fulltext View|Download
Keywords: Flow Discharge; Dependable Flow; Design of Hydropower Building

Last update:

No citation recorded.

Last update:

No citation recorded.