BibTex Citation Data :
@article{JKTS3979, author = {Muhammad Hidayat and Kalih Shofa and Sri Wahyuni and Suseno Darsono}, title = {PERENCANAAN BENDUNGAN MANONJAYA KABUPATEN TASIKMALAYA, JAWA BARAT}, journal = {Jurnal Karya Teknik Sipil}, volume = {2}, number = {3}, year = {2013}, keywords = {Manonjaya; Citanduy River; Dam}, abstract = { Increasing water demand is caused of increasing population at Tasimalaya Regency, inversely with water supply to that area . This problem is solved by constructing a reservoir located in Tasikmalaya regency, West Java that is the Manonjaya Dam . Manonjaya Dam is a earthfill dam with a vertical core which is built at Citanduy River with 590.422 km 2 of catchment area. This aims of dam to fulfill public water supply and irrigation at Tasimalaya Regency. Manonjaya Dam is designed with 100 years of return period with inflow discharge valued 513.9 m 3 /second. Manonjaya Dam is designed 23.5 meters of height, with 3,9 million cubic meters of capacity. The dam has equipped with 3,5 meters of diameter outlet pipe, spillway with 30 meters of width, and USBR III of stilling basin. Construction cost of Manonjaya Dam is around 154 billion Rupiahs with scheduled for 33 weeks. }, pages = {189--204} url = {https://ejournal3.undip.ac.id/index.php/jkts/article/view/3979} }
Refworks Citation Data :
Increasing water demand is caused of increasing population at Tasimalaya Regency, inversely with water supply to that area. This problem is solved by constructing a reservoir located in Tasikmalaya regency, West Java that is the Manonjaya Dam. Manonjaya Dam is a earthfill dam with a vertical core which is built at Citanduy River with 590.422 km2 of catchment area. This aims of dam to fulfill public water supply and irrigation at Tasimalaya Regency. Manonjaya Dam is designed with 100 years of return period with inflow discharge valued 513.9 m3/second. Manonjaya Dam is designed 23.5 meters of height, with 3,9 million cubic meters of capacity. The dam has equipped with 3,5 meters of diameter outlet pipe, spillway with 30 meters of width, and USBR III of stilling basin. Construction cost of Manonjaya Dam is around 154 billion Rupiahs with scheduled for 33 weeks.
Last update: