slot gacor slot gacor hari ini slot gacor 2025 demo slot pg slot gacor slot gacor
PERENCANAAN BENDUNGAN BENDO PONOROGO | Busiri | Jurnal Karya Teknik Sipil skip to main content

PERENCANAAN BENDUNGAN BENDO PONOROGO

*Ahmad Busiri  -  Departemen T. Sipil FT. UNDIP, Indonesia
Rahmawanto Fajar  -  Departemen T. Sipil FT. UNDIP, Indonesia
Sri Sangkawati  -  Departemen T. Sipil FT. UNDIP, Indonesia
Hary Budieny  -  Departemen T. Sipil FT. UNDIP, Indonesia

Citation Format:
Abstract
A number of regionsin Ponorogo, East Java Provincehas a variety of water resource managementissues, includingfloodsduring the rainy seasonandwater shortagesduring the dry season. To overcome these problems then we planned Bendo dam.Methods of planning begins with determining the position of the location, hydrology and hydraulics which finally obtained information to determine the design of the dam. Bendo dam is planned to use dependable discharge with a probability of 80%. Water requirement value to fulfill the needs of irrigation water is 2.19 liters/sec/hectare and the water requirement is 823.7 liter/sec. We used HSS Nakayasu Flood discharge method with 1,000-year return period amounted to 676.37 m3 / sec. Bendo dam is also planned as a hydropower that produces 1.697,953 Kw hydroelectric power. Bendo dam is planned using Rockfill dam type with a core of impermeable clay with a slope of 1: 2,5 in the upstream and 1: 1,75 in the downstream. The peak height is 78,5 m, the width of the peak is 13 m, and the full length of the dam is 354,02 m with 50-years lifetime design.
Fulltext View|Download
Keywords: Irrigation; Hydropower; Rockfill dam; Bendo Dam

Last update:

No citation recorded.

Last update:

No citation recorded.