skip to main content

ANALISIS IMPLEMENTASI CONTRACTOR SAFETY MANAGEMENT SYSTEM (CSMS) PADA TAHAP PERSIAPAN KERJA DI COCA COLA AMATIL INDONESIA (CCAI) SEMARANG

*Zainal Abidin Suery  -  , Indonesia
Bina Kurniawan  -  , Indonesia
Ekawati Ekawati  -  , Indonesia
Published: 5 Aug 2016.

Citation Format:
Abstract
Contractor Safety Management System (CSMS) is a system for managing occupational health and safety (OHS) of contractor in site of business. Work performace by contractor has three category levels of category is low category, medium category and high category. Base on accidently data in Coca Cola Amatil Indonesia (CCAI), there are four fatality incident were recorded in 2013 and three fatality incident in 2014 suffered by contractor. The implementation of CSMS in CCAI still there is unconformity in the implementation. Especialy on OHS requirement compliance by contractor. The OHS requirement compliance by contractor must be completed on pre-job phase. The Iplementation of CSMS on pre-job phase can be affected by variabels such bureaucratic structural, communication, resource, and dispotition of implementor. The purpose of this study is to analyze the implementation of CSMS in pre-job phase in CCAI Semarang. This research is a descriptive study with qualitative approach is done by in-depth interviews. The subjects of this study consists of two main informants and three triangulation  informants. The results showed most of the implementation of CSMS in pre-job phase are progressing well. Can be shown from there is procedure for managing, the clearness of communication in each of event, and the dispotation of CCAI management that fully supported for CSMS implementation. But still there is unconformity in the system of document requirement compliance by contractor. There is no defference in form/application of reqqquirement compliance document for all contractors.  Where generalized for all contractors. it should be distinguished form/application of requirement compliance document for each contractor.
Fulltext View|Download
Keywords: CSMS, bureaucratic structural, communication, resource, dispotition

Article Metrics:

Article Info
Section: Keselamatan dan Kesehatan Kerja
Recent articles
HUBUNGAN TINGKAT KEMANDIRIAN DAN KUALITAS PELAYANAN KB DENGAN LEVEL KEPUASAN AKSEPTOR KB IMPLAN DI PUSKESMAS PUDAK PAYUNG KOTA SEMARANG TRIWULAN I TAHUN 2016 HUBUNGAN PERSEPSI DAN KIE DENGAN KESEDIAAN MOP DI KECAMATAN PADURESO KABUPATEN KEBUMEN TRIWULAN I TAHUN 2016 FAKTOR-FAKTOR YANG BERHUBUNGAN DENGAN PRAKTIK MENGKONSUMSI SOPI (MINUMAN ALKOHOLTRADISIONAL) PADA REMAJA DI DESA TAWIRI KECAMATAN TELUK AMBON KOTA AMBON STATUS RESISTENSI NYAMUK AedesaegyptiTERHADAP MALATHION DI WILAYAH KERJA KKP KELAS III LHOKSEUMAWE(BerdasarkanUji Impregnated Paper danBiokimia) HUBUNGAN KEBERAGAMAN JENIS MAKANAN DAN KECUKUPAN GIZI DENGAN INDEKS MASSA TUBUH (IMT) PADA IBU MENYUSUI DI WILAYAH KERJA PUSKESMAS KEDUNGMUNDU KOTA SEMARANG TAHUN 2016 Hubungan Asupan Makanan (Karbohidrat, Protein dan Lemak) dengan Status Gizi Bayi dan Balita (Studi pada Taman Penitipan Anak Lusendra Kota Semarang Tahun 2016) HUBUNGAN ANTARA MUTASI DENGAN TINGKAT KEPUASAN KERJA AUDITOR DI KANTOR PUSAT BADAN PEMERIKSA KEUANGAN REPUBLIK INDONESIA (BPK RI) JAKARTA ANALISIS KEPATUHAN PELAKSANAAN STANDARD OPERATIONAL PROCEDURE (SOP) PADA PEKERJA KELISTRIKAN DI PT. ANGKASA PURA I SEMARANG TAHUN 2016 HUBUNGAN KADAR TIMBAL (Pb) UDARA DENGAN KADAR TIMBAL (Pb) DALAM DARAH PADA PEKERJA PENGECATAN INDUSTRI KAROSERI DI SEMARANG FAKTOR LINGKUNGAN YANG BERHUBUNGAN DENGAN KEJADIAN LEPTOSPIROSIS DI KOTA SEMARANG BEBERAPA FAKTOR YANG BERHUBUNGAN DENGAN PRAKTIK IMUNISASI PENTAVALEN BOOSTER DI WILAYAH KERJA PUSKESMAS MANGUNSARI SALATIGA BEBERAPA FAKTOR YANG BERHUBUNGAN DENGAN NIAT MEROKOK SISWA SMP DI KOTA SEMARANG More recent articles

Last update:

No citation recorded.

Last update:

No citation recorded.