skip to main content

ANALISIS IMPLEMENTASI IZIN KERJA DI KETINGGIAN TERHADAP KECELAKAAN KERJA DI PT. X

*Helmi Tri Wahyuadi  -  , Indonesia
Bina Kurniawan  -  , Indonesia
Ekawati Ekawati  -  , Indonesia
Received: 28 Jun 2016; Published: 13 Dec 2017.

Citation Format:
Abstract
Work permit is a written document that is used as a condition in carrying out hazardous work with due regard to the potential hazards that exist and anticipated action, also how to control it. Jobs that have the potential hazards are working at height. In PT. X ever happened of occupational accidents related to work at height up to cause the loss of working hours and even days of work. In the application of work permits, PT. X is still less than the maximum, and not in accordance with SOP (Standard Operating Procedure), in the approval of work permits. The purpose of this study was to analyze aspects of the implementation of the work permit in height, at an occupational accidents in PT. X. This research is a qualitative descriptive research method conducted in-depth interviews and field observations. This research subject is the main informant five workers at height, while the informant triangulation from HSE and foreman. Based on the results of the research, knowledge of workers about work permit has been good, with their ability to carry out the implementation of a work permit is good enough, the workers are also in accordance with the requirements of the company, most of the implementation of the work permit at height of at PT. X is not in accordance with the applicable Standard Operating Procedures, control assessments by the hierarchy of controls as substitution, administration, and using personal protective equipment. It is necessary to add the material of the work permit at height on the time of socialization, improving distribution, documentation, management and evaluation system of work permits and coordinated cooperation in the occupational health and safety division.
Fulltext View|Download
Keywords: Implementation, Work Permition, Height, Accidents

Article Metrics:

Article Info
Section: Keselamatan dan Kesehatan Kerja
Recent articles
ANALISIS FAKTOR INTERNAL DAN EKSTERNAL SEBAGAI BAHAN PENYUSUN STRATEGI PENCEGAHAN FRAUD DANA KAPITASI PUSKESMAS DI KOTA SEMARANG ANALISIS BEBAN KERJA BIDAN DESA DI PUSKESMAS DUREN KABUPATEN SEMARANG HUBUNGAN AKTIVITAS FISIK DENGAN GANGGUAN MENSTRUASI WANITA PASANGAN USIA SUBUR DI DESA TEMANGGUNG KECAMATAN KALIANGKRIK KABUPATEN MAGELANG TAHUN 2015 HUBUNGAN BEBERAPA FAKTOR DENGAN PERILAKU SEKSUAL BERISIKO IMS PADA WARIA BINAAN PONDOK PESANTREN (PONPES) WARIA SENIN- KAMIS YOGYAKARTA TAHUN 2015 FAKTOR LINGKUNGAN SOSIAL YANG BERHUBUNGAN DENGAN TINGKAT KEPATUHAN TERAPI PENDERITA HIPERTENSI PRIMER DI PUSKESMAS KEDUNGMUNDU KOTA SEMARANG (Social Environment Factors Associated with The Level of Compliance Therapy in Patients with Primary Hypertension FAKTOR-FAKTOR YANG BERHUBUNGAN DENGAN STATUS KESEMBUHAN PENDERITA TUBERKULOSIS PARU FAKTOR RISIKO DARI ASPEK MATERNAL PADA KEJADIAN BERAT BADAN LAHIR RENDAH (BBLR) DI WILAYAH KERJA DINAS KESEHATAN KOTA CIREBON TAHUN 2014 FAKTOR DETERMINAN AYAH YANG BERHUBUNGAN DENGAN PRAKTIK ASI EKSKLUSIF DI WILAYAH KERJA PUSKESMAS GAYAMSARI KOTA SEMARANG Analisis Upaya Pencegahan dan Pengendalian Kecelakaan Kerja Pada Sebuah Pabrik Semen di Tuban ANALISIS HUBUNGAN ANTARA PENGETAHUAN DENGAN APLIKASI TANGGAP DARURAT KEBAKARAN PADA PERAWAT DI INSTALASI RAWAT INAP RSUD PASAR REBO, JAKARTA TIMUR HUBUNGAN FAKTOR LINGKUNGAN DENGAN PERSEBARAN KEJADIAN DEMAM BERDARAH DENGUE (DBD) DI KECAMATAN JEPARA KABUPATEN JEPARA PERBEDAAN KADAR TIMBAL (Pb) DALAM DARAH BERDASARKAN JENIS PEKERJAAN PADA PEKERJA INDUSTRI PENGECORAN LOGAM DI CV. BONJOR JAYA, CEPER, KLATEN Faktor-Faktor Yang Berhubungan Dengan Perilaku Kerja Karyawan Penderita Aging Disease Di PT Holcim Indonesia Tbk Cilacap Plant Analisis Faktor-Faktor Penyebab Perilaku Merokok Remaja di SMK “X” Surakarta More recent articles

Last update:

No citation recorded.

Last update:

No citation recorded.