skip to main content

ANALISIS SISTEM PENCAHAYAAN DI RUANG SIPIL/SARANA DENGAN SNI NOMOR 03-6575-2001 TENTANG PERANCANGAN SISTEM PENCAHAYAAN BUATAN PT X GRESIK

*Annida Khusnul Mualifah  -  , Indonesia
Hanifa Maher Denny  -  , Indonesia
Baju Widjasena  -  , Indonesia
Received: 24 Jun 2016; Published: 13 Dec 2017.

Citation Format:
Abstract
Intensityilluminationforoffice activityless than according to SNI 03-6575-2001 number 350 lux.Indoor lighting, especially in the workplace that does not meet certain requirements can worsen vision.Less of lighting will cause eyestrain which will then be lowered productivity.This study aimed to analyze the implementation of artificial lighting system and analyzes the factors that influence the artificial lighting system based SNI 03-6575-2001 numbers in the civil / PT X Gresik means.This research is a descriptive qualitative in-depth interviews.The subjects of this research were two people as the main informants and 2 as an informant triangulation.Supporting data used to use observation guidelines in the form.The results showed key informants in plan of lighting system using SNI energy conservation but based SNI 03-6575-2001 numbers do not meet the 66.7% standard rate.Factors that led to the implementation of less than standard lighting systems is the influence of power requirements, light requirements, armature or house lights are used, reflectance, average lighting level, color rendering, the window is not in accordance with the standard rate.Never been given training in planning lighting systems by PT X Gresik and evaluation and monitoring conducted K3, and Sipil, Enjinering.PT X need to provide training planning a lighting system to the main informant to improve the ability of planning a lighting system and making employment contracts K3 involvement in the planning, implementation, evaluation and monitoring.
Fulltext View|Download
Keywords: Lighting Systems, SNI 03-6575-2001

Article Metrics:

Article Info
Section: Keselamatan dan Kesehatan Kerja
Recent articles
IMPLEMENTASI FUNGSI POKOK PELAYANAN PRIMER PUSKESMAS SEBAGAI GATEKEEPER DALAM PROGRAM JKN (STUDI DI PUSKESMAS JUWANA KABUPATEN PATI) ANALISIS BEBAN KERJA BIDAN DESA DI PUSKESMAS DUREN KABUPATEN SEMARANG HUBUNGAN PENGETAHUAN DAN SIKAP WANITA PUS DENGAN KEJADIAN PERNIKAHAN DINI DI DESA LANJAN KECAMATAN SUMOWONO KABUPATEN SEMARANG TAHUN 2013 HUBUNGAN AKTIVITAS FISIK DENGAN GANGGUAN MENSTRUASI WANITA PASANGAN USIA SUBUR DI DESA TEMANGGUNG KECAMATAN KALIANGKRIK KABUPATEN MAGELANG TAHUN 2015 Hubungan Faktor Host (Umur 6 Bulan-14 Tahun) Dan Keberadaan Vektor Dengan Kejadian Demam Berdarah Dengue di Wilayah Kerja Puskesmas Kedungmundu Semarang Relationship Of Host Factors (Ages 6 Months - 14 Years) And Existence Vector With Dengue Hemorrhagic FAKTOR-FAKTOR YANG BERHUBUNGAN DENGAN STATUS KESEMBUHAN PENDERITA TUBERKULOSIS PARU Hubungan Asupan Energi, Asupan Protein, dan Kadar Hemoglobin dengan Produktivitas Kerja Wanita Petani Kelurahan Tegalroso, Kabupaten Temanggung Tahun 2015 GAMBARAN PEMANFAATAN BILIK LAKTASI DI SARANA UMUM KOTA SEMARANG TAHUN 2015 ANALISIS PENGENDALIAN KEBISINGAN DI AREA BODY MINIBUS PERUSAHAAN KAROSERI TAHUN 2015 ANALISIS IMPLEMENTASI IZIN KERJA DI KETINGGIAN TERHADAP KECELAKAAN KERJA DI PT. X PENGARUH VARIASI KONSENTRASI AIR JERUK NIPIS (Citrus aurantifolia) DALAM MENURUNKAN KADAR KADMIUM (Cd) PADA DAGING KERANG DARAH (Anadara granosa) ANALISIS HUBUNGAN DAN SANITASI DENGAN KEBERADAAN COLIFORM FECAL PADA HANDLE PINTU TOILET DI TEMPAT – TEMPAT UMUM DI KOTA SEMARANG HUBUNGAN ANTARA PERSEPSI MASYARAKAT TERHADAP PROGRAM “WARGA PEDULI AIDS” DENGAN PERILAKU PENCEGAHAN PENULARAN HIV/AIDS DI KELURAHAN PETERONGAN, KOTA SEMARANG Faktor – Faktor yang Berhubungan dengan Perilaku Seks Berisiko HIV/AIDS pada Tenaga Kerja Bongkar Muat (TKBM) di Pelabuhan Tanjung Emas Semarang More recent articles

Last update:

No citation recorded.

Last update:

No citation recorded.