Perkembangan ilmu pengetahuan dan teknologi terjadi sangat pesat. Pesatnya perkembangan ini
terjadi hampir meliputi semua sektor. Transportasi laut memegang peran yang sangat penting dalam
menggerakan perekonomian dan mendukung pembangunan nasional dan internasional di semua
bidang. PT United Sindo Perkasa merupakan perusahaan yang terdaftar sebagai penggerak produksi
galangan kapal (Shipyard). PT. United Sindo Perkasa mengalami permasalahan keterlambatan
pembangunan proyek dan penurunan produktifitas kerja karna banyak sekali proses yang berjalan
namun tidak memiliki nilai tambah (waste) yang menyebabkan keterlambatan pembangunan block 107
VSE 220072. Terdapat beberapa metode yang efektif dalam membentu PT. United Sindo Perkasa dalam
menyelesaikan permasalahan tersebut yaitu metode Failure Mode Effect Analysis untuk menemukan
efek dan dampak yang kemungkinan akan menyebabkan kegagalan pada proses produksi kemudian
dilakukan perbaikan terhadap sistem yang dinilai kurang efektif dan menurunkan produktivitas. Metode
selanjutnya adalah metode5 whys yang digunakan untuk mengetahui penyebab-penyebab terjadinya
keterlambatan pada pembangunan atau pembuatan block kapal. penyebab-penyebab terjadinya
keterlambatan pada pembangunan atau pembuatan block kapal sehingga dapat dijadikan sebagai
acuan dalam melakukan pengembangan oleh perusahaan, 5 whys adalah stategi yang dilakukan
dengan mencari tahu penyebab suatu masalah dengan pertanyaan “mengapa” secara berulang untuk
mengekplorasi hubungan sebab-akibat. Selanjutnya dilakukan analisis lanjutan dan akan didapatkan
hasil berupa rekomendasi perbaikan bagi perusahaan.

Kata Kunci: Cause Effect Analysis, Failure Mode and Effect Analysis, 5 Whys Analysis
Abstract
[Implementation Cause Effect Analysis in Construction Process Block 107 VSE 220073 Project 55m
Multipurpose Vessel Ship to Obtain Opportunities for Improvement] The rapid development of science
and technology has had a significant impact on almost all sectors, with the industrial sector being one
of the most affected. The industry plays a crucial role in the economy, and maritime transportation is
particularly important in driving national and international development in all fields. PT United Sindo
Perkasa is one of the companies registered as a shipyard production driver. However, the company is
facing problems with project delays and decreased productivity due to many processes that do not add
value (waste), resulting in delays in the construction of block 107 VSE 220072. There are several
effective methods to help PT United Sindo Perkasa solve these problems, such as the Failure Mode
Effect Analysis method to identify the effects and impacts that are likely to cause failures in the
production process, followed by improvements to the system that is deemed ineffective and reduces
productivity. The next method is the 5 Whys method, which is used to determine the causes of delays in
ship block construction. This will serve as a reference for the company to make improvements. The 5
Whys strategy is carried out by exploring cause-and-effect relationships through repeated questioning
of "why" to find out the root cause of a problem. Further analysis will be conducted, and the results will
provide recommendations for improvement for the company.
Keywords: Cause Effect Analysis, Failure Mode and Effect Analysis, 5 Whys Analysis