skip to main content

PERAN STAKEHOLDERS DALAM PENGELOLAAN OBJEK WISATA SEMARANG ZOO

*Nissa Marcella Widiani  -  Program Studi S1 Administrasi Publik
Dyah Lituhayu  -  Program Studi S1 Administrasi Publik
Titik Djumiarti  -  Program Studi S1 Administrasi Publik

Citation Format:
Abstract
This study aims to describe the role of stakeholders in managing the Semarang Zoo tourist attraction and to identify supporting and inhibiting factors in its management. The background of this research includes a decline in tourist visits, an uncomfortable physical environment, the absence of a sanitation and waste treatment system, weak digital promotion, and limited human resource competencies. This study employs a descriptive qualitative approach, utilizing data collection techniques such as interviews, observation, and documentation. The results indicate five stakeholder roles in the management of Semarang Zoo, namely: policy creator, coordinator, facilitator, implementor, and accelerator. The roles of policy creator and facilitator have been well implemented. However, the coordinator and implementor roles still face obstacles, particularly due to unclear division of responsibilities. The accelerator role also requires improvement, as reflected in the inactive management of Semarang Zoo’s social media accounts. The supporting factors in zoo management include the diversity of attractions and educational interactions, adequate public facilities, a strategic location, and multisectoral cooperation. Inhibiting factors include limited flagship animal collections, lack of disability-friendly infrastructure, damaged road access, and suboptimal service quality from human resources. The relationship between stakeholder roles and the supporting and inhibiting factors indicates that cross-sector synergy needs to be strengthened, especially to overcome structural and operational challenges. This study recommends strengthening stakeholder coordination systems, improving digital promotion, enhancing environmental and accessibility planning, and building human resource capacity to support the sustainable management of Semarang Zoo.
Fulltext View|Download
Keywords: Stakeholders, Stakeholder Roles, Tourism Management

Article Metrics:

Last update:

No citation recorded.

Last update:

No citation recorded.