Author Details

Adhi, Randy Putranto, Departemen Teknik Sipil FT. UNDIP Jl. Prof. H. Soedarto SH., Tembalang, Semarang 50275, Indonesia

  • Volume 5, Nomor 2, Tahun 2016 - Articles
    PERBANDINGAN EFISIENSI WAKTU, BIAYA, DAN SUMBER DAYA MANUSIA ANTARA METODE BUILDING INFORMATION MODELLING (BIM) DAN KONVENSIONAL (STUDI KASUS: PERENCANAAN GEDUNG 20 LANTAI)
    Abstract  PDF