ANALISIS PENERAPAN TOTAL PRODUCTIVE MAINTENANCE (TPM) DENGAN PERHITUNGAN OVERALL EQUIPMENT EFECTIVENESS (OEE) DAN SIX BIG LOSSES MESIN CAVITEC PT. ESSENTRA SURABAYA (STUDI KASUS PT. ESSENTRA) Download