slot gacor slot gacor hari ini slot gacor 2025 demo slot pg slot gacor slot gacor
PENERAPAN SIX SIGMA DALAM RANCANGAN PERCOBAAN FAKTORIAL UNTUK MENENTUKAN SETTING MESIN PRODUKSI AIR MINERAL | Amrulllah | Jurnal Gaussian skip to main content

PENERAPAN SIX SIGMA DALAM RANCANGAN PERCOBAAN FAKTORIAL UNTUK MENENTUKAN SETTING MESIN PRODUKSI AIR MINERAL

*Muhammad Nugroho Karim Amrulllah  -  Universitas Diponegoro
Mustafid Mustafid  -  Universitas Diponegoro
Sugito Sugito  -  Universitas Diponegoro

Citation Format:
Abstract

Machine setting is one of the factors which affects the high defects of mineral water cup. The determination of the optimal machine setting is needed to reduce the defects that occur. Six Sigma DMAIC (define, measure, analyze, improve, control) method in the factorial experimental design can be used for determining the optimal machine setting. This research, which is conducted in PT Sekar Sari, found the most optimal combination of pressure and temperature setting of the machine, so that the defects generated are decreasing after optimal condition treatment. Sigma level increased by 0.89 sigma, from 2,47 sigma to 3,36 sigma and COPQ (cost of poor quality) percentage decreased by 3.64%.

Keywords: Six Sigma, DMAIC, Factorial Design of Experiment, COPQ.

Fulltext View|Download
Keywords: Six Sigma; DMAIC; Factorial Design of Experiment; COPQ

Article Metrics:

Last update:

No citation recorded.

Last update:

No citation recorded.